Designed and made in Alberta Made-to-order arch kits

Doorway arch installation

Fit. Blend. Paint.

The forms create the curve. Careful fitting and finishing make it part of the wall.

Before you start

Gather your supplies.

Fit and attach

  • Construction adhesive suitable for the form and wall materials
  • Painter’s tape
  • Pencil and level
  • Floor protection

Blend the seams

  • Drywall joint tape
  • Compatible joint compound — not spackle
  • Small and wide putty knives

Finish the surface

  • Sanding materials, typically 120 then 220 grit
  • Suitable eye and dust protection
  • Primer and matching wall paint
  • Matching wall texture, if needed

For non-structural indoor openings only. Check product compatibility and follow all adhesive, tape, compound, primer and paint labels. Stop and ask for help if the forms do not fit correctly.

Work in order

Seven finishing steps.

Illustrations from your arch-kit guide. Allow each wet stage to dry or cure fully before continuing.

Dry-fit and mark both pieces.
Installation illustration · step 1

Step 01

Dry-fit and mark both pieces.

Hold both forms inside the opening without adhesive. Align the front edges flush with the finished wall, check level and symmetry, then mark the position. Nothing should need to be forced.

Check the fit before adding adhesive.

Apply construction adhesive.
Installation illustration · step 2

Step 02

Apply construction adhesive.

Apply adhesive to the rear contact surfaces, following its manufacturer’s directions. Keep the front edge clean so the form can sit flush inside the opening.

Do not use adhesive to bridge large unsupported gaps.

Secure the forms and let them cure.
Installation illustration · step 3

Step 03

Secure the forms and let them cure.

Press the forms into position on your marks. Use painter’s tape to hold them securely without sliding, twisting or leaving a raised edge.

Wait for the full cure time specified on your adhesive.

Reinforce the seams.
Installation illustration · step 4

Step 04

Reinforce the seams.

Once the adhesive is cured, remove the painter’s tape. Apply drywall joint tape and compatible joint compound at the transitions, following the tape and compound instructions. Address both faces of the opening.

Tape should lie flat, without bubbles or folded edges.

Blend with thin compound coats.
Installation illustration · step 5

Step 05

Blend with thin compound coats.

Use drywall joint compound, not spackle. Feather successive thin coats farther onto the wall and let each coat dry fully. Blend the seam rather than building a raised border.

One thick coat is harder to finish cleanly.

Sand and check the surface.
Installation illustration · step 6

Step 06

Sand and check the surface.

Sand the dry compound to remove ridges, then refine the surface with finer grit. Use side lighting to spot uneven transitions. Match the existing wall texture if needed.

Wear suitable eye and dust protection; ventilate and control dust.

Prime, then paint.
Installation illustration · step 7

Step 07

Prime, then paint.

Prime the new compound before painting. Match both the wall colour and sheen. Follow the drying and recoat times on the products you use.

Paint will not hide a ridge — correct the surface first.